查词好,翻译快!
  • 翻文字
  • 翻文档
  • 翻图片
  • 改英文
英语 中文
Furthermore, COGEH provides a standard that other groups such as governments, transmission companies, energy purchasers and financial users, just to name a few, can use in their business models. The current edition (COGEH – Consolidated Third Edition – (Online) – December 2018) is an effort to address the inconsistencies, and to consolidate and restructure the materials to reduce redundancies. Figure 5, taken from COGEH (Section 1.3.6), illustrates on a high level the resource classification system and project maturity sub-class. The definitions for the pertinent classifications (as per COGEH) for the purposes of this report are detailed on the following pages. Figure 5 presents a modified version of Figure 6 where suggested minimum thresholds are included for the sub-classes. Figure 5 - Resources Classification Framework (COGEH, Section 1.3.6, Figure 1-2) Project Maturity Sub-classes Range of Uncertainty Not to Scale Figure 1-2. PRMS, Sub-classes based on project maturity Figure 6 - Modified Resources Classification Framework – Includes Usual Requirements for Sub-Classes Project Status Recoverable Volume Class Technology Status Evaluation Status Economic Status Maturity Sub-class Risk Range of Uncertainty Definitions of Reserves
Furthermore, COGEH provides a standard that other groups such as governments, transmission companies, energy purchasers and financial users, just to name a few, can use in their business models. The current edition (COGEH – Consolidated Third Edition – (Online) – December 2018) is an effort to address the inconsistencies, and to consolidate and restructure the materials to reduce redundancies. Figure 5, taken from COGEH (Section 1.3.6), illustrates on a high level the resource classification system and project maturity sub-class. The definitions for the pertinent classifications (as per COGEH) for the purposes of this report are detailed on the following pages. Figure 5 presents a modified version of Figure 6 where suggested minimum thresholds are included for the sub-classes. Figure 5 - Resources Classification Framework (COGEH, Section 1.3.6, Figure 1-2) Project Maturity Sub-classes Range of Uncertainty Not to Scale Figure 1-2. PRMS, Sub-classes based on project maturity Figure 6 - Modified Resources Classification Framework – Includes Usual Requirements for Sub-Classes Project Status Recoverable Volume Class Technology Status Evaluation Status Economic Status Maturity Sub-class Risk Range of Uncertainty Definitions of Reserves
句法分析
1249/5000

此外,COGEH提供了一个标准,其他团体,如政府、输电公司、能源购买者和金融用户等,可以在他们的商业模式中使用。 当前版本(COGEH-合并第三版-(在线)-2018年12月)旨在解决不一致的问题,并整合和重组材料以减少冗余。 图5取自COGEH(第1.3.6节),从较高的层次上说明了资源分类系统和项目成熟度子类。就本报告而言,相关分类的定义(根据COGEH)在以下几页中有详细说明。图5呈现了图6的修改版本,其中为子类包括了建议的最小阈值。 图5 -资源分类框架(COGEH,第1.3.6节,图1-2) 项目成熟度子类 不确定性范围 不按比例尺 图1-2。PRMS,基于项目成熟度的子类 图6 -修改后的资源分类框架-包括子类的通常要求 项目状态 可采量类别技术状态评估状态经济状态成熟度子类别风险 不确定性范围 储备的定义

此外,COGEH提供了一个标准,其他团体,如政府、输电公司、能源购买者和金融用户等,可以在他们的商业模式中使用。 当前版本(COGEH-合并第三版-(在线)-2018年12月)旨在解决不一致的问题,并整合和重组材料以减少冗余。 图5取自COGEH(第1.3.6节),从较高的层次上说明了资源分类系统和项目成熟度子类。就本报告而言,相关分类的定义(根据COGEH)在以下几页中有详细说明。图5呈现了图6的修改版本,其中为子类包括了建议的最小阈值。 图5 -资源分类框架(COGEH,第1.3.6节,图1-2) 项目成熟度子类 不确定性范围 不按比例尺 图1-2。PRMS,基于项目成熟度的子类 图6 -修改后的资源分类框架-包括子类的通常要求 项目状态 可采量类别技术状态评估状态经济状态成熟度子类别风险 不确定性范围 储备的定义

复制
反馈

查询历史

暂时没有您的查询历史

不再显示查询历史

  • 重点词汇
  • purchasers

    买主;(purchaser的复数)

  • to name a few

    仅举几个例子;仅举几例;列举几个;举几个例子说说

  • inconsistencies

    不一致;矛盾;不调和;(inconsistency的复数)

  • restructure

    重组;调整结构;重新安排;重建;重整;重构;改造

  • redundancies

    裁员;冗余;过剩;赘言;(redundancy的复数)

  • pertinent

    相关的;切题的;恰当的;中肯的;贴切的;适宜的;有关系的;直接相关的

  • classifications

    分类;类别;分级;等级;分类学;(classification的复数)

  • as per

    根据;按照;如同

  • modified version

    修改版本;改良版;修订版本

  • thresholds

    门槛;入口;开始;临界值;(threshold的复数)

AI大模型译文